Skip To Content Privacy Page

November 13, 2025

More Terminal 1 Improvements on Tap with Phase 1B

Customer Experience

With the first 19-gate phase of the new Terminal 1 complete, the San Diego County Regional Airport Authority has launched the next phase of construction, which will include 11 additional gates, new customer lounges, a children’s play area and more dining and shopping options.

The completion of Terminal 1’s Phase 1B in 2028 will mark an exciting milestone in the ongoing transformation of San Diego International Airport, bringing travelers a more seamless, comfortable, and connected experience than ever before.

Phase 1B represents more than just new gates and amenities—it’s a major step toward building a smarter, more connected airport experience. With enhanced capacity, and upgraded passenger spaces, the airport will be better equipped than ever to welcome the travelers of tomorrow.

Key Highlights and Benefits

11 Additional Gates
Phase 1B adds 11 new gates, significantly expanding our airport’s ability to provide a better terminal experience to our travelers. This means greater flexibility for airlines and smoother travel for passengers.

Enhanced Passenger Experience
New and upgraded customer lounges, concessions, a children’s play area and infrastructure improvements will bring modern comfort to every step of the journey. Whether relaxing before a flight or waiting for a connection, travelers will notice the difference in design, technology, and service.

Saying Goodbye to the Original Terminal 1

As part of this modernization, the original Terminal 1 has been permanently closed and is in the process of being demolished.

Traveling Between Terminals During Continued Construction

During construction, the roadway between Terminals 1 and 2 will be closed to all traffic.  Your best bet for moving between the terminals is our Inter-Terminal Shuttle, which operates daily from 4 a.m. to 2 a.m.,

Related Content

A Little Extra Help Goes a Long Way: Say Hello to SAN Assist
Customer Experience
February 24, 2026

A Little Extra Help Goes a Long Way: Say Hello to SAN Assist

Travel days can be exciting—but they can also feel like a lot. At San Diego International Airport (SAN), we know that not every traveler’s needs are easy to spot. That’s […]

Terminal 2 Curbside and Crosswalk Improvements Underway  
Customer Experience
February 10, 2026

Terminal 2 Curbside and Crosswalk Improvements Underway  

Heads up! To enhance safety, accessibility, and pedestrian flow, work on the Terminal 2 Sidewalk and Crosswalk Improvement Project has begun and will continue through July 1.   The work includes:  While most […]

San Diego International Airport Launches SAN Pass
Customer Experience
November 19, 2025

San Diego International Airport Launches SAN Pass

Non-ticketed visitors can now experience Terminal 1 and 2 beyond security The San Diego County Regional Airport Authority (Airport Authority) is introducing SAN Pass, a new program that allows San […]

San Diego International Airport (SAN) provides seamless travel experiences with nonstop flights to destinations worldwide, offering convenient services and amenities for all travelers.

SDCRAA
P.O. Box 82776
San Diego, California 92138-2776

© 2026 San Diego County Regional Airport Authority. All rights reserved.